Hainan Synchronous Start 51 Disease Rain Reservoir Reinforcement Project involves 15 prefens

Wanning Successful Car Reservoir. People’s Network Fan Huan Di is understood that this project is also the first EPC project project that Hainan is independent of design unit.

"Qiu Chuqi said," According to the traditional model of the past, we need to manage the design, supervision, construction, and now only need to manage 上海贵族宝贝自荐419 a unit, save a lot of intermediate communication links, manage faster and more effective, coordinated It is more convenient to get up.

"In addition, the hydropower group will jointly establish a member of the project to establish a project, and promote the construction of project construction in the joint EPC general contract, and play the pioneering role of party members. Strictly follow the time node to advance the construction progress, and 上海品茶群怎么进 ensure that the project is completed as scheduled. After the construction of the 51 reservoir reinforcement project is completed, the reservoir flood control and disaster reduction capacity can improve the life and property of the people in the reservoir of the reservoir, increase the income of farmers in the irrigation area. Local economic development. (Editor: Chen Haiyan,上海夜生活品茶 Xi Xiuqin).